The hotel located in the Móricz Zsigmond Street will have four stories in addition to the cellar level and the ground floor, and it will be constructed at an area of 15 660 m2.
The design of the hotel includes high roof and a façade made in the Caribbean style. The cellar level extending over an area over 4100 m2 will house the mechanical equipment, the garage space and the service parts, while the ground floor covering a floor space of nearly 3500 m2 will contain the lobby, a restaurant, bar and the hallway.
The floors I, II, and III will have an area of 2380 m2, and will containthe hotel rooms. Floor IV covering an area of 1000 m2 will accommodatethe fitness and wellness part, as well as the mechanical services.
Theresponsibilities of the contractor Grabarics Construction Ltd includethe earthwork and the deep foundation, as well as the erection ofreinforced concrete structure and the special building engineeringworks.
At the same time, the contractor performs works of thespecial craft and finishing works (waterproofing, thermal and soundinsulation, carpentry, roof covering, sheet covering and façadeformation, stone cladding, application of paint coatings, external andinternal doors and windows, metalworking structures and glass walls).