Menu
2019. 02. 21
Instead of cold covering: concrete
In phase 4 of the Sasad Liget Residential Park 297 apartments are being constructed. The floor covering of the upper terraces (about 1500 sq.m) will be constructed by the staff of our decor concrete business from 60x60 cm concrete slabs instead of porcelain stoneware.
Instead of cold covering: concrete

The most important expectations set against cement floors include rugged, durable, easy to clean, and aesthetic appearance. The floor slabs made in our RC prefabrication plant at Heves comply with all three expectations and besides, as a result of careful planning and designing, they are excellent in terms of aesthetics and resemble very much the appearance of stoneware tiles.

  • In December 2021, Szeged was enriched with a large-scale facility when the Szeged Multifunctional Handball Hall (also known as the PICK Aréna) was inaugurated. The complete prefabricated structure of the sports centre was designed and the elements were manufactured and installed on site by Grabarics Reinforced Concrete.
  • Grabarics Development’s project under preparation will be a 5-apartment condominium at 16 Kapy Street, Pasarét, Budapest, District II. The preliminary design works are currently underway.
  • On 17 June, the National Athletics Centre, Budapest’s new sports and leisure park, which will also host the World Athletics Championships in August, opened.
  • In order to make us able to write that Grabarics Construction Ltd was founded 30 years ago, a number of factors had to develop in our favour. The anniversary of a company is about its history.
  • One of Europe’s most modern communications technology complexes has been completed, resembling the magical world of the Narnia novel sequence, said András Koltay, President of the National Media and Infocommunications Authority (Hungarian abbreviation: NMHH) at the inauguration of the organisation’s Metrology Building Complex.