By the spring of 2021, the four-level Tiszavirág Swimming Stadium in Szeged, with a useful floor area of about 13.5 thousand square metres, was entirely completed. The prefabricated reinforced concrete structures of the facility were manufactured by Grabarics Vasbeton at its prefabrication plant in Heves.