The complex development of the Buda Hospital of the Charity Order has come to a milestone as the execution plan of the second phase of the project has been accepted by the Hungarian head of theCharity Order of Patient Care, father Imre Kozma.
In phase 4 of the Sasad Liget Residential Park 297 apartments are being constructed. The floor covering of the upper terraces (about 1500 sq.m) will be constructed by the staff of our decor concrete business from 60x60 cm concrete slabs instead of porcelain stoneware.
The production of exposed concrete has come in the foreground again. Due to construction traditions in Hungary, the concept of exposed concrete is not as clearly understood as in Germany.
During the trip starting from Budapest, the students were given an insight into the operation of the reinforced concrete prefabrication plant, and were able to gain theoretical information about the advantages of prefabricated elements and the diversity of technical solutions.
The theme of this year’s drawing competition is SAFETY THAT CONNECTS US, which this year is a great opportunity to mark the World Day for Safety and Health at Work.
In December 2021, Szeged was enriched with a large-scale facility when the Szeged Multifunctional Handball Hall (also known as the PICK Aréna) was inaugurated. The complete prefabricated structure of the sports centre was designed and the elements were manufactured and installed on site by Grabarics Reinforced Concrete.
Grabarics Development’s project under preparation will be a 5-apartment condominium at 16 Kapy Street, Pasarét, Budapest, District II. The preliminary design works are currently underway.