We delivered the donation to the shelter in Paks in the second half of December. We managed to please the leader of the shelter and his 340 protegees with nearly 200 kg dog food, lots of linens, blankets, bowls and with two bales of straw.
We have managed by the power of collaboration that a whole town and its region act together for the recovery of István Pecsét supported through the Public Foundation for the Life of Dunaújváros.
Two phases of the Sasad Liget project had been realized so far. The 212 apartments of phase three are being constructed, an undertaking of our company as well.
During the trip starting from Budapest, the students were given an insight into the operation of the reinforced concrete prefabrication plant, and were able to gain theoretical information about the advantages of prefabricated elements and the diversity of technical solutions.
The theme of this year’s drawing competition is SAFETY THAT CONNECTS US, which this year is a great opportunity to mark the World Day for Safety and Health at Work.
In December 2021, Szeged was enriched with a large-scale facility when the Szeged Multifunctional Handball Hall (also known as the PICK Aréna) was inaugurated. The complete prefabricated structure of the sports centre was designed and the elements were manufactured and installed on site by Grabarics Reinforced Concrete.
Grabarics Development’s project under preparation will be a 5-apartment condominium at 16 Kapy Street, Pasarét, Budapest, District II. The preliminary design works are currently underway.